The scope of work requires the provision of Electrical Engineering Services to consist of the following:
Electrical Services
- Internal Electrical Installation (Lighting, Power receptacles, etc.) for the 600-seat auditorium.
- Upgrade of the 33/11kV Network Distribution System
- Upgrade of 33/11kV Substation comprising of installations of 1 No 5MVA 33/11kV transformer, 11kV Switchboard, 12 No. Ring Main Units.
- 1X2MVA Standby Power Supply with 2.5MVA 0.415/11kV step-up transformer
Client:
Central Bank of Nigeria (CBN)
Location:
University of Ilorin, Ilorin, Kwara State
Project Status:
2011 to date.
Services Provided:
- Project Management
- Detailed Engineering Design & Supervision.