Delta State Government of Nigeria Electrification Project

Project Description:
The project which commenced in 2002 involved the Design and Construction of the 132kV Double Circuit Transmission Line and 132/33kVA Transformer Substation as part of the Delta State Government’s attempt at ensuring adequate power supply to its communities. The transmission line which transverses Oleh to Ogwashi-Uku draws power from the Ughelli power station to the neighbouring communities along the Ughelli Ogwashi-Uku axis.

Client:
Delta State Ministry of Energy.

Location:
Delta State.

Project Status:
Completed in 2005.

Services Provided:

  • Feasibility Studies
  • Load Estimation / Forecasting
  • Preliminary Engineering Designs
  • Final Engineering Design
  • Site Supervision of Contractor’s Activities
  • Project Management
  • Detailed Engineering Control
  • Materials / Procurement Control
  • Tests Certificate and Commissioning
  • Head Office Back-up services
  • Training