Rivers State Electrification Project (RSEP)
Project Description:
The project which commenced in 2000 was a State-wide Electrification project involved the Design of the 132kV Double Circuit Transmission Line and 132/33kVA Transformer Substation. The Rivers State Government embarked on this laudable project to complement the Federal Government’s efforts at ensuring adequate power supply to the Nation. The proposed Transmission Line now evacuates Power from the Rivers State sponsored independent power stations to the National Grid.
Client:
Rivers State Ministry of Power.
Location:
Rivers State.
Project Status:
Completed in 2002.
Services Provided:
- Providing assistance to the State Government in the selection process of Contractors
- Geotechnical Investigations
- Construction Planning and Cost Estimation
- Tender Stage Design of Civil Engineering, M&E Plant, Transmission and Substation Works
- Preparation of Technical Specifications for the Civil Engineering, M&E Plant, Transmission and Substation Contracts.
- Preparation and Evaluation of Bid Documents
- Assistance with Contract Negotiation and Contract Award
- Site Supervision of Contractors’ Activities
- Project Management
- Detailed Engineering Control
- Material/Procurement Control
- Training
- Test Certificate and Commissioning
- Head Office Back-Up Services